| Ammunition storage. These 5 covers needs to replace by new ones |
|
|
|
|
| New second hand covers |
|
|
| Like new |
|
|
| Bridge wings. This cover is the air
outlet from the ventilation system. Two big vents for air in and out are located under the bridge |
|
|
| Also a new second hand cover |
|
|
| Here showing the new cover on the Starboard side |
|
|
| To repair the superstructure / deck
welding a 100 mm by 8 mm steel
plate is welded to both. 42 meter total length all around the superstructure. |
|
|
|
|
|
|
|
Using the angel grinder to finish it and prepare it fore painting. |
|
|
|
Like new |
|
|
| Like new |